|
|
 |
°¡½º·ÎÄ®ÀÛ¾÷(Gas
Local Heat Treatment)  |
|
| |
º¼ÅÊÅ©
& ¾Ð·Â¿ë±â ·ÎÄ® ¿Ã³¸®(Ball Tank & Vessel Gas Firing (P.W.H.T.))¿Í
³»È¹° ¿Ã³¸®(Dry-out Gas Heat Treatment) |
| |
| |
1)°³¿ä |
| |
Àç·áÀÇ ¿ëÁ¢ºÎÀ§´Â º¸Åë °ÀçÀÇ Ç׺¹Á¡¿¡ °¡±î¿î ³»ºÎ ÀÀ·ÂÀÌ ºÎºÐÀûÀ¸·Î ÀÜ·ùÇÏ¿©
ÀÖ°í ÀÌ ÀÜ·ùÀÀ·ÂÀ» Á¦°ÅÇÏ´Â °ÍÀ» ÁÖµÈ ¸ñÀûÀ¸·Î ÇàÇÏ´Â ÈĿ󸮸¦ ÀÀ·Â Á¦°Å Ç®¸²À̶ó°í ºÎ¸¥´Ù. ÈĿó¸®ÀÇ °¡Àå
´ëÇ¥ÀûÀÎ ÀÛ¾÷Àº ÀÀ·ÂÁ¦°Å Ç®¸²Àε¥, ÀÌ´Â ÀÜ·ù ÀÀ·Â Á¦°Å¿¡ À¯È¿ÇÒ »Ó¸¸ ¾Æ´Ï¶ó ÀçÁú°ú Ä¡¼ö¸¦ ¾ÈÁ¤½ÃŰ´Â È¿°ú°¡
ÀÖÀ¸¹Ç·Î ASME,BOILER AND PRESSURE VESSEL CODE¿¡¼´Â Á¾·¡ÀÇ STRESS RELIEF
ANNEALINGÀÇ ¿ë¾î ´ë½Å¿¡ ÈÄ¿ 󸮶ó´Â ¿ë¾î¸¦ ±×´ë·Î »ç¿ëÇϰí ÀÖ´Ù. ÈÄ¿¿¡ ÀÇÇØ ÀÜ·ù ÀÀ·ÂÀÌ ¿ÏȵǴÂ
ÀÌÀ¯·Î´Â ÀÜ·ù ÀÀ·ÂÀÌ ÀÖ´Â ¿ëÁ¢Ç° Áß¿¡´Â ÀÎÀåÀÀ·Â ºÎºÐ°ú ¾ÐÃàÀÀ·Â ºÎºÐÀÌ ÀÖ¾î¼ ¼·Î ²ø¾î ´ç°Ü ±ÕÇüÀÌ µÇ¾î ÀÖÀ¸³ª
À̰ÍÀ» Àû´çÇÑ °í¿ÂÀ¸·Î °¡¿Çϸé Å©¸®ÀÌÇÁ¿Í ÀÀ·Â ÀÌ¿ÏÀ¸·Î ¼Ò¼º º¯ÇüÀÌ »ý±â±â ¶§¹®ÀÌ´Ù. À̿ܿ¡ ³»ºÎ ¿Ö°îÀÇ È¸º¹°ú
Àç°áÁ¤ÀÌ »ý°Ü Á¶Á÷ÀÌ º¯ÈÇÑ´Ù.
ÀÀ·Â Á¦°Å Ç®¸²¿¡ ÀÇÇØ ±â´ëµÇ´Â È¿°ú´Â ´ÙÀ½°ú °°´Ù.
*¿ëÁ¢ ÀÜ·ù ÀÀ·ÂÀÇ Á¦°Å
*ÀÀ·Â ºÎ½Ä¿¡ ´ëÇÑ ÀúÇ×·ÂÀÇ Áõ´ë
*¿ëÁ¢ºÎÀÇ ¼ö¼Ò ¹æÃâ¿¡ ÀÇÇÑ ÀÚü ÆÄ±«ÀÇ ¹æÁö
*Ä¡¼öÀÇ ºø³ª°¨ ¹æÁö
*¿ëÁ¢ºÎÀÇ ¿¬¼ºÁõ°¡
*¿ ¿µÇâºÎÀÇ ¶ßÀÓ ¿¬È
*³ÊÄ¡Àμº ¹× °µµ º¯È
ÀÀ·ÂÁ¦°Å Ç®¸²ÀÇ ¿ä¼Ò´Â ´ÙÀ½ °¢ Ç×À» °í·ÁÇÏ¿© °áÁ¤ÇÑ´Ù.
*Å« Ãæ°Ý ÇÏÁßÀ» ¹Þ´Â °Í
*°Ý½ÉÇÑ ¿Âµµ º¯È¸¦ ¹Þ´Â °Í
*Ã뼺 ÆÄ±«ÀÇ ¿ì·Á°¡ ÀÖ´Â ¿Âµµ·Î »ç¿ëµÇ°í ÀÖ´Â °Í
*»ì µÎ²²°¡ Å©°í Ã뼺 ÆÄ±«ÀÇ ¿ì·Á°¡ ÀÖ´Â °Í
*ºÎ¼ÓǰÀ» ÁýÁßÇÏ¿© ºÎÂø ¿ëÁ¢ÇÑ °Í
*¾ß±ÝÇÐÀû °ßÁö¿¡¼ ÀçÁú °³¼±ÀÇ Çʿ䰡 ÀÖ´Â °Í
*³Ã°£ °¡°øµµ°¡ Å« °Í
*±âŸ Á߿䵵°¡ Å« °Í
*±Ø½ÉÇÑ ¾Ð·Â º¯µ¿À» ¹Þ´Â °Í
|
| |
|
| |
1) OUTLINE |
| |
Welded joint contains residual internal stress
close to the yield point of general steel partly. Therefore preheat
treatment is needed to remove the residual stress.
We name it as stress relief annealing. Stress relief annealing
is the main method of preheat treatment. It is not only effective
to remove the residual stress but effective to stabilize the nature
of material and dimension. Therefore in the case of ASME, BOILER
AND PRESSURE VESSEL CODE, instead of STRESS RELIEF ANNEALING used
before, preheat treatment itself is being used. The reason residual
can be relieved throughpreheat treatment is like this. In the
welded material containing residual stress,tension stress part
and compressive
stress part are well balanced by pulling each other. Then if this
is heated at the
proper high temperature, plastic deformation occurs by creep and
stress release.
Because of this, residual stress can be relieved through preheat
treatment.
Beside this, the structure become changed due to the recovery
of internal
defect and recrystallization.
The expected effect through stress relief annealing is below.
¥ë The relief of welded residual stress.
¥ë The increase of resistance toward stress corrosion.
¥ë The prevention of natural fracture by welded hydrogen exposure.
¥ë The increase of tenderness in welded part.
¥ë The prevention of dimension's mismatch.
¥ë The prevention of tempering tenderness in heat effected area.
¥ë The change of tenderness and hardness.
We decide the factor of stress relief annealing considering below.
¥ë Thing that receives big impact weight.
¥ë Thing that receives rapid temperature change.
¥ë Thing that is being used with the temperature that tends to
cause brittle fracture.
¥ë Thing that has deep internal thickness and that tends to cause
brittle fracture.
¥ë Thing that was welded together with fittings mainly.
¥ë Thing that needs the improvement of the nature of material in
the view of metallurgy.
¥ë Thing that has high degree of cold working.
¥ë Thing that has extra importance.
¥ë Thing that receives the rapid change of pressure. |
| |
|
| |
1. º¼ÅÊÅ© ¿Ã³¸®(Ball
Tank Gas Firing) |
| |
1) ½ÇÀû |
| |
| ¹øÈ£ |
¿¬µµ |
ÇÁ·ÎÁ§Æ®¸í |
Á¦Ç° |
½Ç Àû |
¾÷ü¸í |
| 1 |
2008 |
OS TANK EXPANSION(¥±) PJT. |
ID16,840 x 58t x 1±â |
|
S-TANK
·Ôµ¥´ë»êÀ¯È |
| 2 |
2007 |
H.P. ETHYLENE STORAGE TANK |
ID15,640 x 69t x 1±â |
|
S-TANK
LG CHEMICAL |
| 3 |
2006 |
PROPYLENE STORAGE TANK |
ID17,400 x 60t x 2±â |
|
S-TANK
SK°Ç¼³ |
| 4 |
STC G1 PJT.
(NCC EXPANSION) |
ID16,200 x 42t x 1±â |
|
S-TANK
»ï¼ºÅäÅ» |
| 5 |
OS TANK EXPANSION PJT. |
ID16,840 x 50t x 2±â
ID15,640 x 59.3t |
|
´ëºÀ¾ÆÅ©·ÎÅØ
·Ôµ¥´ë»êÀ¯È |
| 6 |
2005 |
K-32 STRORAGE TANK |
ID9,850 x 50t x 1±â |
|
´ëºÀ¾ÆÅ©·ÎÅØ
¿ï»êÈÇÐ |
| 7 |
2003 |
STS 3Á¦° ½Å¼³°ø»ç |
ID9,200 x 36t x 4±â |
|
¼ºÁøÁö¿ÀÅØ
POSCO E & C |
| 8 |
2002 |
TS-5000 PJT. |
ID16,310 x 45t/47t x 5±â |
|
ÇÑÅØ/´ë¸²»ê¾÷
µ¿¼¼®À¯ÈÇÐ |
| 9 |
2001 |
K-32 STRORAGE TANK |
ID9,850 x 50t x 1±â |
|
´ëºÀ¾ÆÅ©·ÎÅØ
¿ï»êÈÇÐ |
|
| |
|
| |
| Àå ºñ ¼³ Ä¡ |
º¸ ¿Â |
 |
 |
| ÁغñÀÛ¾÷ |
¿Ã³¸®ÀÛ¾÷(GAS FRIRNG) |
 |
 |
|
| |
|
| |
2.
¾Ð·Â¿ë±â ¿Ã³¸®(Vessel Gas Firing) |
| |
1) ½ÇÀû |
| |
| ¹øÈ£ |
¿¬µµ |
ÇÁ·ÎÁ§Æ®¸í |
Á¦ ǰ |
½Ç Àû |
ºñ °í |
| 1 |
2007 |
JAMNAGAR EXPORT REFINERY PJT. |
ID6,700X81t/48tX2±â |
|
DAEKYUNG TECHNOS |
| 2 |
LAFFAN REFINERY PJT. |
ID7,200x30Mx28t/33tx1EA
ID6,000x29Mx68t/80t |
|
WOOYANG HC |
| 3 |
2004 |
KOREA ZINC PJT. |
ID3,200xH5,000x25tx2EA |
|
SEIL |
| 4 |
RAS LAFFAN ONSHORE
EXPANSION PJT. |
ID6,700x8,700Lx77t Etc.2EA |
|
DOOSAN MECATEC |
| 5 |
2003 |
CO PLANT CORE PROCESS |
ID1,622x40tx1EA |
|
HANTECH |
| 6 |
Æ÷Ç× 1Á¦° Àü·Î¼³ºñ
ÇÁ·ÎÁ§Æ® |
ID5,720/3,160xH4,700x50t
ID5,720/3,912xH4,700x50t |
|
BASTEC |
| 7 |
2002 |
RAS LAFFAN ONSHORE
EXPANSION PJT. |
ID6,700x8,700Lx58tx1EA |
|
DOOSAN MECATEC |
| 8 |
1999~2000 |
RESIDUEL FLUID CATALYTIC
CRACKING UNIT ETC. |
ID6,700x40,850L
ID5,486x19,248Lx23tx2EA |
|
POSREC
TAIWAN SPOT ETC |
| 9 |
MALAYSIA OLEFINS PJT. |
ID1,750x34,091Lx14t
ID10,850x2,820Lx24t/20t |
|
SJMC |
|
| |
|
| |
| º¸¿ÂÀÛ¾÷ |
º¸¿ÂÀÛ¾÷ |
 |
 |
| ¿Ã³¸®ÀÛ¾÷ |
ÀÛ¾÷¿Ï·á |
 |
 |
|
| |
|
| |
3.
³»È¹° °ÇÁ¶ ÀÛ¾÷(Dry-out Heat Treatment) |
| |
2) ½ÇÀû |
| |
| ¹øÈ£ |
¿¬ µµ |
ÇÁ·ÎÁ§Æ®¸í |
Á¦ ǰ |
½Ç Àû |
¾÷ü¸í |
| 1 |
2007 |
CCR REVAMP PROJECT |
CASTABLE(¼ÒµÐ·Î ¿Ã³¸®) |
2 |
´ë°æÅ×Å©³ë½º |
| 2 |
2005 |
SOHAR REFINERY PJT. |
CASTABLE |
1 |
POSREC |
| 3 |
2004 |
COMMON PJT. |
CASTABLE |
1 |
POSREC |
| 4 |
SOHAR REFINERY PJT. |
NOZZLE/VESSEL/CONE Etc. |
10 |
POSREC |
| 5 |
2003 |
FINEX PJT. |
CASTABLE |
1 |
POSCO E&C |
| 6 |
RIO POLIMEROS |
CASTABLE |
4 |
JNK / ABB |
| 7 |
SYNCRUDE UE-1 etc. |
CASTABLE |
9 |
JNK etc. |
| 8 |
2001 |
MOGP PJT. |
VESSEL 3EA |
1 |
SUNGJIN GEOTEC |
| 9 |
EXPANSION OF LA TEJA
REFINERY |
|
1 |
HANTECH / ABB |
| 10 |
2000 |
MADERO PJT. |
VESSEL 2EA |
2 |
SJMC
POSREC |
|
| |
|
| |
|
| |
|
| |
|